Work begins on I-75 bridge over Maumee

0

Through October 2010 a bridge deck overlay on Interstate 75, in both directions, from Wales Road in
northern Wood County to Collingwood Boulevard in Toledo, including the Disalle Bridge, will create
traffic delays.
Motorists can expect lane restrictions and closures of various ramps in this area.
The suggested alternate route is Interstate 475.
Through Saturday from 6 p.m. through 6 a.m., expect intermittent lane closures on southbound I-75, from
South Avenue to Miami Street for pavement repair.
Southbound I-75 in this area may be reduced to one lane from 10 p.m. through 6 a.m.
Also through Saturday at 6 a.m., the ramp from southbound I-75 to Miami Street (Exit 199B) will be
closed. Ramp detour: Wales Road (Exit 198); northbound I-75; Miami Street (Ohio 65).
Beginning Monday through November, I-75, in both directions, from Wales Road to Collingwood Boulevard
(Exit. 201A) will be reduced to two lanes for crossover installation. Additionally, the ramp from South
Avenue to southbound I-75 will be closed.
Detour: Northbound I-75; Collingwood Avenue (Exit 201A); southbound I-75.

No posts to display