Legals: 09-09-13

0

001 LEGALNOTICE On 9/3/13, Weston Village Council passed emergencyResolution #2013-3 to enter into
a cooperative agreement with the WoodCounty Commissioners to submit an OPWC grant application for “2014
WoodCounty Collaborative Village and Township Roadway Improvements”. A fullcopy of this ordinance is
available at the Village Hall and at www.westono hio.org. Sept. 9, 16, ’13


INVITATION TO BID SEALED BIDS for the furnishing of the necessary
materials andconstruction of theROSSFORD GENERAL I/I REMOVAL
NORTHWESTERN WATER AND SEWER DISTRICT will be
received by the Northwestern Water and Sewer District, 12560Middleton Pike, Bowling Green, Ohio 43402
until10:00 a.m. (LocalTime)Tuesday, September 24, 2013and at that time and place will bepublicly opened and
read aloud.The scope of work consists ofreworking 50 "hammer taps" and groutthe interfaces in
Jennings Eastsewers as well as CIPP line 1,200 lineal feet of 12" diameter sewer withreworking and
grouting 64 protruding lateral services in the ColonyRoad sewer system. Approximately 1,160 vertical feet of
manholes willrequire lining with cementitious product.The contract documents,including plans and
specifications, are onfile at the office of theNorthwestern Water and Sewer District and the Engineer —
PoggemeyerDesign Group, Inc. (PDG).A set may be obtained from BeckerImpressions, 4646 Angola Road, Toledo,
Ohio 43614, Telephone419-385-5303, www.pdgplanroom.com. A non- refundable deposit inthe amount of $50 will
be required for each set of plans andspecifications; check must be made payable to Becker
Impressions.TheEngineer for the Project is Poggemeyer Design Group, Inc., 1168NorthMain Street, Bowling
Green, Ohio43402.All bids must be signed andsubmitted on the blanks which are boundin this booklet.Bids
muststate the unit prices in the blanks provided and be enclosed in a sealedenvelope marked —
Rossford General I/I Removal — andaddressed to the Northwestern Water
andSewer District, 12560Middleton Pike, Bowling Green, Ohio 43402.The bid guaranty may be oftwo forms:1. A
Bid Guaranty and Contract Bond using the form in theContract Documents.(The amount of the bid doesNOT have
toappear on this form.)2. A certified check, cashier’s check or letterof credit in favor of the Northwestern
Water and Sewer District in theamount of 10% of the bid.If the contract is awarded, a Contract Bondwill be
required, which is a 100% payment and performance bond. Thisprocurement is subject to the EPA policy of
encouraging theparticipation of small businesses in rural areas (SBRAs).After theaward of the contract let
by competitive bid and prior to the time thecontract is entered into, bidders shall submit the affidavit
requiredunder the Ohio Revised Code, Section 5719.042 that the bidder was notcharged with any delinquent
personal property taxes in Wood County,Ohio.The successful bidder will be required to pay not less than
thehighest applicable minimum wage rates as established by the federalDavis-Bacon Wage Determinations issued
by the U.S. Department of Labor.No bidder may withdraw his bid for a period of 60 days after thescheduled
closing time for the receipt of bids.This project is beingpartially funded with Ohio EPA Water Pollution
Control Loan Fund(WPCLF) funds.The estimated cost of construction is $450,000.ByOrder ofJerry
GreinerPresidentSept. 9, 16, ’13


001 LEGALNOTICE On 9/3/13, Weston Village Council passed
emergencyResolution #2013-3 to enter into a cooperative agreement with the WoodCounty Commissioners to
submit an OPWC grant application for “2014 WoodCounty Collaborative Village and Township Roadway
Improvements”. A fullcopy of this ordinance is available at the Village Hall and at www.westono hio.org.
Sept. 9, 16, ’13


INVITATION TO BID SEALED BIDS for the furnishing of
the necessary materials andconstruction of theROSSFORD GENERAL I/I REMOVAL
NORTHWESTERN WATER AND SEWER DISTRICT will be
received by the Northwestern Water and Sewer District, 12560Middleton Pike, Bowling Green, Ohio 43402
until10:00 a.m. (LocalTime)Tuesday, September 24, 2013and at that time and place will bepublicly opened and
read aloud.The scope of work consists ofreworking 50 "hammer taps" and groutthe interfaces in
Jennings Eastsewers as well as CIPP line 1,200 lineal feet of 12" diameter sewer withreworking and
grouting 64 protruding lateral services in the ColonyRoad sewer system. Approximately 1,160 vertical feet of
manholes willrequire lining with cementitious product.The contract documents,including plans and
specifications, are onfile at the office of theNorthwestern Water and Sewer District and the Engineer —
PoggemeyerDesign Group, Inc. (PDG).A set may be obtained from BeckerImpressions, 4646 Angola Road, Toledo,
Ohio 43614, Telephone419-385-5303, www.pdgplanroom.com. A non- refundable deposit inthe amount of $50 will
be required for each set of plans andspecifications; check must be made payable to Becker
Impressions.TheEngineer for the Project is Poggemeyer Design Group, Inc., 1168NorthMain Street, Bowling
Green, Ohio43402.All bids must be signed andsubmitted on the blanks which are boundin this booklet.Bids
muststate the unit prices in the blanks provided and be enclosed in a sealedenvelope marked —
Rossford General I/I Removal — andaddressed to the Northwestern Water
andSewer District, 12560Middleton Pike, Bowling Green, Ohio 43402.The bid guaranty may be oftwo forms:1. A
Bid Guaranty and Contract Bond using the form in theContract Documents.(The amount of the bid doesNOT have
toappear on this form.)2. A certified check, cashier’s check or letterof credit in favor of the Northwestern
Water and Sewer District in theamount of 10% of the bid.If the contract is awarded, a Contract Bondwill be
required, which is a 100% payment and performance bond. Thisprocurement is subject to the EPA policy of
encouraging theparticipation of small businesses in rural areas (SBRAs).After theaward of the contract let
by competitive bid and prior to the time thecontract is entered into, bidders shall submit the affidavit
requiredunder the Ohio Revised Code, Section 5719.042 that the bidder was notcharged with any delinquent
personal property taxes in Wood County,Ohio.The successful bidder will be required to pay not less than
thehighest applicable minimum wage rates as established by the federalDavis-Bacon Wage Determinations issued
by the U.S. Department of Labor.No bidder may withdraw his bid for a period of 60 days after thescheduled
closing time for the receipt of bids.This project is beingpartially funded with Ohio EPA Water Pollution
Control Loan Fund(WPCLF) funds.The estimated cost of construction is $450,000.ByOrder ofJerry
GreinerPresidentSept. 9, 16, ’13


No posts to display